Leading AI Initiatives
The Pilot-to-Production Gap
8 min+70 XPStep 1/10
The actual lifecycle
A real AI project runs: pick a narrow, expensive problem → baseline the current process (what does it cost today, how often is it wrong?) → pilot on real data against a pre-set bar → harden (guardrails, fallbacks, monitoring, integration) → roll out in stages → own it forever (evals, re-tuning, model upgrades).
The step everyone skips is the baseline — and without it, you'll never prove the thing worked, because nobody wrote down what 'before' looked like.
insight
Budget the phases honestly: the pilot is ~10–20% of total effort. Hardening and integration are where the other 80% lives. Plans that treat the pilot as the project are how pilots become permanent.